Zhengzhou Huitong Pipe Fitting Co., Ltd.
|
Price: | 10.0~1000.0 USD |
Payment Terms: | T/T,L/C,WU |
Place of Origin: | Henan, China (Mainland) |
Add to My Favorites | |
HiSupplier Escrow |
Contact: Lisa
Email: lisa at htpipe dot com
Skype: htpipelisa
Tee Type
Equal tee, reducing tee,lateral tee, BW/butt weld tee, TH/threaded tee, SW/socket weld tee, seamless tee
Standard
ASME/ANSI B16.9 ANSI/ASME B16.11 ANSI/ASME B16.28
MSS SP-43 MSS SP-75 MSS SP-79
JIS B2311 JIS B2312 JIS B2313 JIS B2316
SY/T 0510 SH3408 SH3409
ISO 3419 ISO 5251
DIN 2605
Size:1/2''~48''(Seamless); 16''~72''(Welded)
Wall thickness:Sch5~Sch160\XXS
Manufacturing process:Push, Press, Forge, Cast, etc.
Material
Carbon steel:
ASTM A234 WPB WPC
ASTM A420 WPL6, WPL3;
ASTM A860 WPHY 70 WPHY 65 WPHY 60 WPHY 52 WPHY 46 WPHY 42
Stainless steel:
ASTM A403 WP304/304L
316/316L/316Ti/316H
317/317L
321/321H/347/347H/348
Alloy steel:
ASTM A234 WP12, A234 WP11, A234 WP22, A234 WP5, A234 WP9,
Duplex steel
ASTM A815 S31803; S32750; 32760; NO8904;S31254
Nickel alloy steel:
Alloy 400/Monel 400/UNS S4400
Alloy 600/Inconel 600/UNS NO6600
Alloy 201/nickel 201/UNS S2201
Alloy 625/Inconel 625/UNS S6625/NS336
Packing: Wooden cases, pallets, nylon bags or according to the customers' requirements
MOQ: 1 piece
Delivery time: 10-100 days depending on quantity
Payment terms: L/C,T/T,Western Union
Shipment: FOB Tianjin/Shanghai, CFR, CIF etc
Application: Petroleum/Power/Chemical/Construction/Gas/Metallurgy/Shipbuilding etc
Remarks: We can accept processing wtih supplied drawing and samples.